Arlington Demolition

The Details

RDL Group successfully demolished the 57-unit apartment Arlington block in Mt Cook to make way for a $33m upgrade.

The heavily reinforced concrete structures were located in a populated residential area, bordering on a busy main arterial route to SH2.

The demolition required a staged and controlled operation to undertake the deconstruction of each block of units separately to ensure adequate access and safety onsite.

All operational and planning work undertaken on this project was carried out in accordance to RDL Group’s comprehensive health and safety plan, and site specific method statements.